Bespoke moulded full tee-piece
Format: pdf
Bespoke moulded full tee piece (MWFTP)
The liner should be pinned and fixed before any hot air welding of the tee piece.
Fixings specification engineered for gutter substrate type
Substrate | Product Code | Pilot hole (if required) | Drill speed |
STEEL < 3mm | HDS-LS-30 | N/A | 0-2000rpm – Can be full speed |
STEEL > 3mm | HDS-HS-40 | N/A | 0-2000rpm – Can be full speed |
CONCRETE | HDS-CON-45 | 5mm Diameter | 0-950rpm – Typically 750Watt |
ASBESTOS | HDS-ASB-38 | 9.5mm Diameter | Set to lowest speed |
Please refer to the current health & safety guide when drilling holes into asbestos cement and other highly bonded materials.
The illustration above shows a typical installation with 12 fasteners but if more are required, apply fixings using the ‘200 rule’.
The 200 rule
A maximum gap of 200mm is permitted between fixings in the pinning region.
So, for a 300mm gap, an additional fixing is required to bisect at 150mm, while a 600mm gap is bridged with two further fixings (one at 200mm and one at 400mm).
Order your bespoke moulded full tee piece
This component is an important part of many successful Plygene Gutterline installations and is designed to create a water junction between two gutters.
To order yours, complete the attached document with your project dimensions, job reference number and the quantity you require.
Function: Water junction between 2 gutters
Type: Datasheets