Behind existing wall flashings
- At survey stage ensure liner can go behind the existing flashing
- Ensure that the existing flashing is sealed/chased to the full length of the wall
- Ensure the existing flashings are in good condition and suitable for use
- Ensure the liner is installed to within 5mm to the area where the existing flashing is sealed/chased to the wall
- Suitably fix the liner to the existing parapet at 500mm centres using the specified fixings
- Re-dress the flashing over the liner