Moulded components

General guidelines that should be followed when installing all moulded components are as follows:

  • Ensure the area where the component is to be installed is clean and dry. Blow dry with heat gun if damp
  • Firmly press the liner into the gutter creases. This will prevent air pockets and form a solid base to weld the stop end to the liner
  • Always use the 200mm rule (the liner should be pinned every 200mm across the gutter sole and up the gutter slopes if required)
  • With the heat gun tack weld the component into place ensuring the location is correct before a full weld is employed
  • The weakest point of any weld is the crease lines on the gutter sole
  • Allow the component to cool before probe testing the weld
  • Any un-welded areas will need to be re-welded and again probe tested once cool