- Ensure both gutters leading into the corner are clean and dry. Blow dry with heat gun if damp
- Address both liners up to the corner ensuring the liners are firmly pressed into the crease lines of the gutter sole
- With the specified fixings supplied, pin the liner 35mm from the gutter crease onto the sole of the gutters x 4 and 35mm up the gutter slopes x 4
- Using the 200mm rule pin the liner every 200mm across both gutter soles and the gutter slopes x 4 if required
- Ensure Sharmans Fixing Caps are installed over all fixings prior to welding
- The weakest point of any weld is the crease lines on the gutter sole. Weld at these points first ensuring the corner is pressed firmly into the gutter creases
- Fully weld the flange to both soles of the corner followed by all four gutter slopes. Allow the corner to cool before probe testing the welds
- Any un-welded area’s will have to be re-welded and again probe tested once cool