Getting started
-
- Unroll around 10m of liner at one end of the gutter and fold along crease lines
- Gutter Stop End
- Envelope fold liner to full height of stop end (click here for full fitting instructions)
- Install moulded stop end detail (click here for full fitting instructions)
- Fix angle blank or template blank using specified fixings
- Continue to unroll the liner and crease to the profile of the gutter until you reach the next mouldable component
- To prevent water ingress behind the liner a suitable weathering option must be utilised