Get in touch.

Say hello

T: +44 (0)1298 812371
F: +44 (0)1298 812237
E: [email protected]

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Under the existing roof sheet

  • At survey stage ensure liner can be fitted under the roof sheets
  • Ensure the roof fixings are in good condition and suitable for use
  • Remove or loosen the bottom row of roof fixings, ensure the liner goes under the roof sheet and above the holes were the fixings have been removed
  • Eaves fillers may need to be removed. Replace after the liner is in place. (reseal if required)
  • Replace or tighten the fixings to trap the liner

Image placeholder
Zoom in Zoom out