Get in touch.

Say hello

T: +44 (0)1298 812371
F: +44 (0)1298 812237
E: [email protected]

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Option 2 – Post overclad

  • Fit liner up the front of the existing eaves cover flashing
  • Return the liner onto the underside of the roof sheet ensuring there is a minimum further 70mm overhang
  • Fit new once bent flashing to mechanically fix the liner to the underside of the roof sheet using Sharmans fixings
Option 2 – Post overclad

Option 2 – Post overclad

Image placeholder
Zoom in Zoom out