Get in touch.

Say hello

T: +44 (0)1298 812371
F: +44 (0)1298 812237
E: [email protected]

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Gutter and Roof Talk

Archive: Outlet

Side sump box complete with outlet

Ensure the gutter around the side sump box is clean and dry. Blow dry with heat gun if damp Continue to roll the liner two metres beyond the side sump…

Category:

Full side outlet

Ensure the gutter around the side outlet hole is clean and dry. Blow dry with heat gun if damp Continue to roll the liner two metres beyond the side outlet…

Category:

Side box complete with outlet

Ensure the gutter around the side box is clean and dry. Blow dry with heat gun if damp Continue to roll the liner two metres beyond the side box ensuring…

Category:

Sump box complete with outlet

Make sure the gutter around the sump box is clean and dry. Blow dry with heat gun if damp Continue to roll the liner two metres beyond the sump box…

Category:

Moulded stop end with outlet and weir

Ensure the gutter at the stop end is clean and dry. Blow dry with heat gun if damp Address the liner to the stop end. (No need to fold the…

Category:

Moulded stop end with outlet

Ensure the gutter at the stop end is clean and dry. Blow dry with heat gun if damp Address the liner to the stop end. (No need to fold the…

Category: