Get in touch.

Say hello

T: +44 (0)1298 812371
F: +44 (0)1298 812237
E: [email protected]

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Gutter and Roof Talk

Archive: Stop end

Back to back moulded stop end cover unit

Ensure both gutters leading to the stop ends are clean and dry. Blow dry with heat gun if damp Address both liners to the stop ends. (No need to fold…

Category:

Moulded stop end with outlet and weir

Ensure the gutter at the stop end is clean and dry. Blow dry with heat gun if damp Address the liner to the stop end. (No need to fold the…

Category:

Moulded stop end

Ensure the gutter at the stop end is clean and dry. Blow dry with heat gun if damp Address the liner to the stop end. (No need to fold the…

Category:

Getting started

Unroll around 10m of liner at one end of the gutter and fold along crease lines Gutter Stop End Envelope fold liner to full height of stop end (click here…

Category:

Preparation

Remove all debris from the gutter Sweep any standing water down the outlets If any other liner system is present, a gutter calculation should be carried out in order to…

Category: