DHL, Skelmersdale
Client:
DHL
Contractor:
Oakley Industrial Services
Factory engineered to meet this complex site challenge.
When Midlands-based facilities management and construction specialists Oakley Industrial Services were asked to provide a fully extended lifecycle solution to 1,400 linear metres of poorly maintained leaking gutters as part of the dilapidation works, they immediately chose Plygene Gutterline backed by its BBA approval and 25 year guarantee.
Sharmans provided its full technical support service, including initial survey, existing condition report, specification generation and field site audit and inspection working alongside Oakley as its Trained Contractor partner. With two boundary gutters and three valley gutters each measuring over 280 linear metres, engineering a solution to reduce site complexity was a critical consideration. The solution was to manufacture the Plygene Gutterline liner in 56m rolls and factory mould some 64 weir overflows and 135 high density syphonic clamping rings.
Oakley Director, Peter Clark, expalins, “The fact that the team from Sharmans were able to supply us with these additional, bespoke, accessories was a key reason why we chose to work with the Plygene Gutterline system on this project. It meant that there were no delays on site, thus saving both time and money. It was also something that no other gutter maintenance solutions supplier could do.”
Peter expands further, “For over seven years, we’ve consistently used Plygene Gutterline on a wide variety of projects and it never lets us down. There is simply no other product like it; it fixes leaking gutters for good! The Plygene material is flexible and hard-wearing, and installation is quick and easy for our roofers. Most importantly, it stops the gutters leaking and ensures longevity because of its 25 year guarantee. I’d recommend it to anyone that listens.”