Plygene® Gutterline delivers life long results with minimum disruption.

In early 2015, Roofing Consultants, a leading commercial and industrial roofing contractor, undertook a substantial and complex gutter refurbishment project at the RS Components centre in Nuneaton.

Richard Lennon, Managing Director of Roofing Consultants comments, “For this particular project our team had a short timescale of just 4-6 weeks, and we needed a solution that would immediately resolve the issue of leaking gutters with minimal disruption to the client.”

Richard goes on to say:
“Having incorporated Plygene Gutterline within our specifications for many years, we know first-hand that their solution was ideal because of its flexibility and 25 year guarantee.”

The Plygene Gutterline system is specifically engineered for gutter environments with seamless and non-bonded design elements to deliver a minimum 25 year guarantee, backed with its unique BBA certification. Roofing Consultants knew that it was the perfect solution for this complex project which included gutters with failed joints from 30 to 130 metres long, running from boundary to valley, with complex T-sections, Transitions and Corners and an array of syphonic outlets.

 

RoofingConsultants2

 

“Patching up gutters once a leak has occurred can prove costly in the long run and we are increasingly finding more and more buildings that are having water ingress due to poor maintenance and localised repairs, or where companies have tried to use a liquid alternative, which has subsequently failed.”

“Sharmans was incredibly proactive in terms of keeping the project flowing with a phased schedule of deliveries throughout the project to meet the client’s tight deadline.”